405 Freeway Ramp Reopens
_Web.jpg)
Wilshire Boulevard On-ramp. (Metro Los Angeles)

The New 405 On-ramp Off Wilshire Boulevard. (Metro Los Angeles)
The 3,129-foot-long ramp is expected to accommodate twice as many cars.
Other ramps at the Wilshire Boulevard-405 Freeway interchange were lenghthened to ease congestion.
The reconstruction of the on-ramp replaces a single-lane onramp that would slow traffic down.
The new ramp is part of a $1-billion project that seeks to reconfigure 10 miles of the 405 Freeway. The project is expected to be completed in less than a year, according to county Supervisor Zev Yaroslavsky.